  1. Assess the wastewater

    Review water use, discharge points, flows and variations in pollutant loading. These data form the design basis.

  2. Design the treatment plant

    Compare treatment processes, size tanks and equipment, and plan connections and access for the operating team.

  3. Build and commission

    Coordinate civil works, pipework and process equipment, then organise testing and the handover to the operator.

Explore the water treatment photographs ↗

Project delivery

Seven stages of a treatment plant project

  1. Site assessment

    Site observations, water use and operating constraints inform the initial assessment.

  2. Effluent characterisation

    Flow variations, sampling and analysis establish the design loads.

  3. Design and sizing

    The proposed treatment train is documented in sizing notes and drawings.

  4. Construction or rehabilitation

    Civil works, pipework and equipment are installed or adapted to the existing plant.

  5. Commissioning

    Initial testing and control adjustments are recorded in the commissioning report.

  6. Operator training

    Hands-on sessions cover operation, routine maintenance and safety.

  7. Performance monitoring

    Periodic checks and treated-water results guide maintenance and upgrades.